Progress is stalled on the other half of the pitch because I keep forgetting to pick sticks up when I’m walking about and need some for the dugouts!
I have considered adding Elvish runes on the rocks and will probably put some on once everything else is finished and I can see what it all looks like.
First half of the pitch with more work – basically clump foliage as bushes, and painted the stream bed ready for water pouring later.
I can report that four 10mm x 5mm disc rare earth magnets in each half is quite sufficient to hold the two halves together, so I may not need any clasps at all.
On the other hand attempts with the static grass applicator are disappointing so far, I can’t see any discernable difference between using it and just scattering it normally.